Skip to content
The Global Hub Development
Under construction

I-16  Beit Al Watan

2nd District — Beit El Watan, New Cairo

I-16 sits in Beit Al Watan and is built to the owners' association model: members own the building together, and The Global Hub runs design, contracting, supervision and handover.

I-16 — Beit Al Watan

Status

Under construction

Areas

145 – 210 sqm

Delivery

To be set with the union

Payment

Open-cost statement shared with members

Unit types

Apartment — Duplex

Unit sizes

145 – 210 sqm

Unit types

Apartments & duplexes

Floors

4 floors

Price

Open-cost statement shared with members

Handover

To be set with the union

A residential building with a limited number of units

Overview

I-16 sits in Beit Al Watan and is built to the owners' association model: members own the building together, and The Global Hub runs design, contracting, supervision and handover.

Units are apartments and duplexes between 145 and 210 sqm, delivered fully finished.

Features

  • Neo-classical facade with stone elements and cornices
  • Fully finished units handed over ready to live in
  • Facade and entrance lighting design
  • Owners' union managing the building from day one

Plans & units

I-16 — Beit Al Watan — Facade by day
Facade by day
I-16 — Beit Al Watan — Facade by night
Facade by night
I-16 — Beit Al Watan — Corner perspective
Corner perspective
I-16 — Beit Al Watan — Facade detail
Facade detail
I-16 — Beit Al Watan — Entrance lobby — marble & lighting
Entrance lobby — marble & lighting
I-16 — Beit Al Watan — Lobby cladding detail
Lobby cladding detail
I-16 — Beit Al Watan — Main entrance door
Main entrance door
I-16 — Beit Al Watan — Corridor & apartment doors
Corridor & apartment doors
I-16 — Beit Al Watan — Unit layout
Unit layout

Execution timeline

Completed

Design & studies

Architectural drawings and cost items presented to the members.

Completed

Owners' union formation

Documents signed and shares defined before execution starts.

Current stage — current stage

Structure & utilities

Concrete works, brickwork, electrical and plumbing first fix.

Upcoming

Facade & finishing

Date announced after union approval.

Upcoming

Handover & union management

Date announced after union approval.

Frequently asked questions

The cost is presented to members item by item. Any change in material or works prices is presented and approved inside the union before execution — no increase is charged to a member without a documented decision.

Request I-16 — Beit Al Watan details

We send you the available areas and specifications, and a consultant contacts you — with no obligation.